
Demurrage is the cost that turns a manageable import into a painful one, and it is almost never caused by the thing importers worry about. It is caused by paperwork, and it compounds daily while that paperwork is sorted out.
They are two separate charges
This trips up most people, because the words get used interchangeably and the invoices do not.
- Demurrage is charged by the shipping line, on the container, for keeping their equipment beyond the free days allowed. It is the line wanting its box back.
- Storage (or rent) is charged by the terminal, on the cargo, for occupying space beyond the free period. It is the terminal wanting its yard back.
They run on separate clocks, with separate free periods, and you can be accruing both at once. Clearing one does not stop the other.
Why cargo sits
In our experience the causes cluster into a short list, and nearly all of them are documentary:
- The PAAR was raised late, so the assessment was not ready when the vessel arrived.
- Documents disagree with each other — invoice, packing list and bill of lading showing different quantities, values or descriptions.
- A regulatory certificate was left until arrival, so SON, NAFDAC or another agency has a hold on cargo that is physically sitting there.
- The declared value is queried, and the reassessment takes time.
- Duty funds were not arranged before the figure was known.
Note what is not on that list: the ship being late. Importers plan around transit and get caught by documentation.
The compounding problem
Demurrage usually escalates in tiers — the daily rate rises the longer the container is held. A delay that looked tolerable in week one is materially worse in week three, and the charge is being applied to every container in the consignment, not just one.
This is why a dispute worth arguing about on day one is often not worth arguing about on day ten. The accruing cost can overtake the amount in dispute.
How it is actually avoided
By moving the work earlier, which is the entire argument for filing Form M before the supplier ships and raising PAAR while the cargo is still at sea. If the assessment is agreed and duty is paid before arrival, the free period is doing what it is there for rather than being burned on admin.
The second lever is document discipline. Before anything ships, the commercial invoice, packing list, bill of lading and certificate of origin should describe the same goods, in the same quantities, at the same value, under the same HS code. That is unglamorous and it is where the money is.
If the clock is already running
Deal with the binding constraint first. Establish which hold is actually stopping release — Customs, an agency, the terminal, or the line — because clearing the others changes nothing while that one stands. Then decide quickly: in a lot of cases paying a disputed assessment and recovering it afterwards costs less than arguing while demurrage accrues.
Clearing is the part of this we handle in-house, which is the point: the agencies are chased by the same people who filed the documents. If you have cargo sitting, tell us what is holding it. If you are planning an import, the duty calculator will tell you what to have funded before the vessel lands.
Want this priced against your actual route?
Send the route, commodity and rough weight and a named coordinator comes back with rates and the duty position.
Request rates