
Importers tend to treat gate-out as the finish line. It is not. The inland leg has its own costs and its own failure modes, and the ones that catch people are rarely about distance.
The container deposit nobody budgets for
When a shipping line’s container leaves the port, there is normally a refundable deposit against its safe return within a set period. It is refundable in principle; in practice, the refund depends on returning the box on time and in good condition.
If the container sits at your site because you could not offload promptly, you risk both the deposit and additional charges from the line. This is the single most common inland surprise we see, and it is entirely a planning problem — the cost is driven by how quickly your site can turn the container around.
Can your site actually receive it?
Worth confirming before the truck is dispatched, not when it arrives:
- Can a 40ft trailer physically reach and manoeuvre at the delivery point?
- Is there a forklift, and is its capacity right for the heaviest single item?
- Are there people to offload, during hours the driver can wait?
- Is there somewhere to put the goods once they are off?
A truck that arrives at a site that cannot offload it becomes a waiting charge, and then possibly a second trip.
Choosing the equipment
Flatbed, sided trailer or container chassis is decided by the cargo, not by preference. Out-of-gauge or heavy items may need a route survey, permits and escort — all of which take lead time and none of which can be arranged usefully on the day.
The Ghana corridor
Cross-border movement adds a customs dimension to the road leg. Documentation has to satisfy the crossing as well as the original import, and a corridor movement is best planned as a single file rather than two disconnected jobs.
Sequence it with clearing, not after it
Haulage planned only once Customs has released means the cargo waits at the terminal while a truck is found, accruing storage. Haulage planned while the PAAR is being processed means the truck is ready when the release is.
If your site cannot take the goods immediately, moving them into warehousing and drawing down is usually cheaper than leaving them where the terminal is charging for the space.
Insurance does not stop at the port
Check that your cover extends to the inland leg. Door-to-door means door to door; cover that ends at the port leaves the road movement exposed, and the road leg is not the lowest-risk part of the journey.
We run port-to-door across Nigeria and into the Ghana corridor, sequenced with the clearing rather than bolted on afterwards. Tell us the delivery point and what is coming and we will tell you what the site needs to receive it.
Want this priced against your actual route?
Send the route, commodity and rough weight and a named coordinator comes back with rates and the duty position.
Request rates